As users of Microsoft Project, Project Online, or Project Server, you’ve probably been asked by your senior management for a visual overview of your project or portfolio so that they can understand the dates, statuses, and risks without unnecessary technical details. Traditionally, project managers have met such requests by manually reconstructing their project Gantt charts or timelines in PowerPoint.

The disadvantages to such manual project reporting are two-fold. First, recreating a project timeline or Gantt chart by hand in PowerPoint is both tedious and time-consuming. Once you’ve created your chart the first time, you’re signing yourself up for periodic updates, which means recreating that same visual over and over each time your project changes. Second, hand-built charts in PowerPoint can be inaccurate. Sometimes this is by mistake, and sometimes it is purposeful shading of reality. Either way, a chart with no footholds in the data won’t go far in convincing your stakeholders that it’s much more than a pretty picture.

OnePager Pro aims to solve both problems by providing understandable graphics comparable to PowerPoint, while firmly maintaining integrity with the underlying Microsoft Project plan(s), both initially and across all periodic updates.

Example of Visualizing Key Milestones and Phases in OnePager Pro
Example of Visualizing Key Milestones and Phases in OnePager Pro

OnePager Pro imports one or multiple project plans, is compatible with Microsoft Project (*.mpp files), Project Online, and Project Server, and gives users the ability to filter those projects so that only key tasks and milestones appear in the chart. Once the projects have been imported and the chart created, users have many options to customize the formatting and layout of their chart, before exporting to PowerPoint or PDF to share with their audience.

Here are a few of the key features that OnePager Pro provides in addition to what you get out of the box from Microsoft Project.

Choose from Multiple Layouts

No two projects are the same. OnePager offers multiple layout options so that you can decide the best way to arrange your tasks and milestones in the chart. Below, we have the same project, displayed three different ways.

A Gantt Chart Layout places each task and milestone in its own row, creating a waterfall that cascades a project’s tasks from start to finish.

Gannt Chart Layout in OnePager Pro
Gannt Chart Layout in OnePager Pro

A Timeline Layout compresses the chart so that tasks are lined up left-to-right in sequence, typically when they share the same parent task, or are members of the same subproject. OnePager can create timeline layouts automatically based on the work-breakdown structure (WBS) that you’ve already established in Microsoft Project.

Timeline Layout in OnePager Pro
Timeline Layout in OnePager Pro

A Birds-on-a-Wire Layout is another flavor of a timeline layout, but trades tasks for milestones, so the audience focuses on delivery dates instead of durations. In this example, the parent tasks remain as a bar in the background, but all the other tasks have been switched to milestones linked to their finish dates.

Birds-on-a-Wire Layout in OnePager Pro
Birds-on-a-Wire Layout in OnePager Pro

Group and Sort into Swimlanes

Swimlanes enable you to group and sort your tasks and milestones into sections based on any field that you already have set up in Microsoft Project. Typically, OnePager places tasks into swimlanes based on the WBS of the underlying Microsoft Project plan. But in practice, any field from Project, including enterprise custom fields from Project Online or Project Server, can define your swimlanes.

OnePager supports multiple levels of swimlanes, allowing you to group swimlanes first by one field, and then again into sub-swimlanes by other fields. In this example, we first group by project, then by program, and finally by phase.

Group and Sort into Swimlanes in OnePager Pro
Group and Sort into Swimlanes in OnePager Pro

Stylize your Chart with Conditional Formatting

Everyone loves reports with a splash of color, but it’s not just a matter of aesthetics. Color is one of the best ways to distinguish one set of related tasks from another, or to make certain tasks stand out. OnePager’s patented conditional formatting engine enables users to set up rules which automatically assign meaningful colors, based upon properties of each task. In this example, OnePager assigns color based on the status of each task in Microsoft Project.

Conditional Formatting Rules in OnePager Pro
Conditional Formatting Rules in OnePager Pro

In addition to supporting rules that assign color, OnePager supports conditional formatting of the following task properties:

  • Task shape
  • Milestone shape
  • Hash fill pattern
  • Size
  • Border
  • Font

When users apply conditional formatting to their OnePager charts, those rules remain in effect through future updates. So, in the above example, if a task starts out as late and then becomes complete, it will automatically turn from red to green without the need for users to hand-paint colors, as they would in PowerPoint.

Display Key Project Details

Not all project reports require significant amounts of details— for some it is sufficient to just track key dates and status. But in cases where your audience needs to understand more than the basics, OnePager can pull in many other elements of your project and incorporate them into your chart, either graphically or as text.

Displaying Key Project Details in OnePager Pro
Displaying Key Project Details in OnePager Pro

In the above example, OnePager displays the following “decorations”:

  • Percent Complete is displayed as a yellow progress bar along the bottom of each task.
  • Baselines appear underneath the primary tasks and milestones to visually track planned vs. actual.
  • Tasks that are on the Critical Path display a red highlight along the top of the task bar.
  • Dependencies show predecessor-successor relationships, which can be filtered to avoid information overload.
  • Date Labels show specific dates for key milestones.
  • Text Columns display any other project data that isn’t rendered graphically, such as cost.

Quickly Update and Track Changes

While it’s usually quick to set up a OnePager chart, you still don’t want to have to create a new one each time your project changes. OnePager offers a one-click refresh that will quickly pull your updated data from Project and refresh all the information in your chart.

How to Quickly Update and Track Data Changes in OnePager Pro
How to Quickly Update and Track Data Changes in OnePager Pro

If you plan on conducting a post-mortem, or just need to understand how your project or portfolio has changed week-by-week or month-by-month, OnePager also offers the ability to take snapshots at specific points in time. As you refresh your chart, OnePager preserves the historical information about your project, enabling you to move backward and forward in time to visualize changes as they take place.

In this example, the statuses, finish dates, and costs are changing from snapshot to snapshot.

Snapshots Moving Through Time in OnePager Pro
Snapshots Moving Through Time in OnePager Pro

Standardize Reporting with Templates

Much in the same way that OnePager makes it easy to update the same chart as your project changes, templates allow you to create multiple charts that contain the same styles and rules. If you have a chart that you like, you can save it as a template. You can then use that template to create new charts from different projects that share the same rules, swimlane definitions, and graphical look and feel as the original chart. Better yet, you can share your template with your colleagues and enable them to create similar charts without the same amount of setup time.

Learn More

Whether you are a solo project manager, or part of an enterprise PMO, OnePager will help you simplify and standardize your reporting out of Microsoft Project, Project Server, or Project Online with graphically stunning, data-driven timelines and Gantt charts. MPUG readers are invited to take a free trial of OnePager Pro to see how it works with their own projects.

Get Weekly PM Insights

Join 50,000+ PMs receiving updates on the latest PM methodologies, PDU opportunities, tool reviews, career tips, and member exclusives.

Protected by reCAPTCHA: Privacy & Terms

PMI ATP
PMI Authorized Training Partner
REP #4082

Learning Paths

PMP® TrainingCAPM® TrainingPgMP® TrainingPMI-ACP® TrainingMS ProjectMS PlannerMS TeamsJira

PM Resources

PDU TrackerLive WebinarsSalary CalculatorTool ComparisonsJob BoardKnowledge BasePM GlossaryOur Faculty

Community

Discussion ForumStudy GroupsEvents Calendar

Follow Us

LinkedInYouTubeTwitterFacebook
MPUGMaster Project User Group

© 2026 MPUG. All rights reserved.

TermsPrivacySitemapAdvertise
Articles

Introduction to OnePager Pro for Microsoft Project

OnePager Pro is a tool that allows users to create data-driven project timelines and Gantt charts from Microsoft Project plans. Learn about its key features, including multiple layout options, swimlanes, conditional formatting, and the ability to quickly update and track changes.

6 min read
•almost 4 years ago•Updated 10 months ago•
S
Safford BlackAuthor
Project Management
Microsoft Project
Best Practices
Productivity
S
Safford Black

Content Writer

Safford Black is the founder and Chief Operating Officer of OnePager, the developers of plan communications software with the same name. OnePager is an add-on to Microsoft Project that turns project data into summary graphics in seconds. Safford has held various management positions in the technology industry for more than a decade and holds a BA in psychology and management from Rice University. Learn more about OnePager.

View all articles by Safford Black
Related Content

Continue Reading

Discover more insights and articles that complement your current reading

Collaboration challenges in remote projects (and how to fix each one)
Articles
1 min read

Collaboration challenges in remote projects (and how to fix each one)

Discover 5 common remote project collaboration challenges, from knowledge silos to unclear ownership, and learn practical ways to keep teams aligned and work moving.

A
Anonymous
7 days ago
Read
An Introduction to the PMI Practice Standard for Scheduling Conformance Index
Articles
1 min read

An Introduction to the PMI Practice Standard for Scheduling Conformance Index

Learn how the Conformance Index in PMI’s Practice Standard for Scheduling scores a CPM schedule model, and how to assess its components in any scheduling tool.

A
Anonymous
19 days ago
Read
A PM’s Halloween Survival Guide: The Sequel You Didn’t Want but Definitely Need
Articles
1 min read

A PM’s Halloween Survival Guide: The Sequel You Didn’t Want but Definitely Need

Part II of the PM Halloween survival guide takes on shape-shifting requirements and dependencies that won’t stay resolved, with practical defenses for each.

A
Anonymous
about 1 month ago
Read
Explore All Articles