Back to ArticlesBack

Join 50,000+ PM Professionals

Get expert PM insights, PMP prep tips, and earn PDUs with exclusive content delivered weekly.

Protected by reCAPTCHA: Privacy & Terms

MPUG - Master Project User GroupMPUG

Adapted for MPUG from Eric Christoph’s article published on transformativems.com.

Choosing your project control journey – from transformativems.com

Most enterprise software assumes you already know the process. Documentation lives in one place, training happens somewhere else, and the application itself just waits for you to tell it what to do. That gap has always cost teams time. Now that organizations are layering AI assistants on top of that same software, it’s starting to cost them more than time, because an AI assistant is only as useful as the process knowledge it can actually reach.

That’s the problem Eric Christoph set out to solve with the Journey System inside ProjectXL.

What the Journey System actually does

ProjectXL started as a scheduling tool, but it’s grown into something closer to a full project controls environment: schedule, cost, funding, baselines, and version control all working together. That’s more capable, but it also means there’s more for a user to learn and more decisions to make along the way. The more a tool can do, the easier it is to get lost inside it.

The Journey System exists to solve that. It looks at two things together: which journey the user has selected, and what the project workbook actually shows right now. It doesn’t rewrite the data or create a separate version of the project. It reads the facts already available, whether a baseline exists, whether actuals are current, what’s still missing, and uses that to decide what to surface, what to block, and what deserves attention next.

TMS built three journeys to match where a project actually is in its life:

  • Integrated is the full model: schedule, cost, baselines, actuals, and performance working together, for projects being run as a true operating system.
  • Schedule Only keeps schedule governance in view without requiring the cost side to be maintained when that isn’t where the project is yet.
  • Basis of Estimate is for the earlier stage, when the job is still shaping assumptions and building a defensible estimate before execution starts.

None of these are permanent choices. A project can start in Basis of Estimate while scope is being defined, move to Schedule Only while the plan gets built out, and shift to Integrated once execution and cost tracking become live concerns, all without losing any of the underlying project data.

Why this matters beyond ProjectXL

Christoph sees this as pointing at something bigger than one tool. The instinct behind most enterprise software has been to hand the user a bigger feature set and a manual, then hope training closes the gap. The Journey System takes the opposite approach: it uses the evidence already sitting in the project data to tell users what’s ready, what’s blocked, and what to do next, right inside the surface they’re already working in.

That same structure is what makes AI genuinely useful instead of generic. When an assistant already knows the selected journey, the current stage, and what the workbook evidence shows, it doesn’t have to start from a blank conversation. It can answer in the context of where the project actually is, not with boilerplate advice that could apply to anyone. The Journey System doesn’t depend on AI to work; it can guide users entirely on its own. But it gives AI something real to stand on when a team does bring it in.

The bigger idea

Christoph argues that every organization underestimates how much time gets lost to “figuring out where to go” inside their tools. Embedded guidance, built from a project’s own evidence rather than a static help menu, is what’s next for enterprise software generally, not just for project controls. Readers looking for the full technical walkthrough, including how the Journey System’s interface is structured, can find it in more detail on the TMS site.

Eric Christoph is a Senior Partner at Transformative Management Solutions, where he helps project teams implement EVM and Agile project control solutions using Microsoft Power Platform technologies. He previously served as Corporate EVM Subject Matter Expert for L-3 Communications, building baseline plans for over 100 projects and proposal efforts with a combined value over $400B.


mpug logo

Elevate your project management skills and propel your career forward with an MPUG Membership. Gain access to 500+ hours of PMI-accredited training, live events, and a vibrant online community. Watch a free lesson and see how MPUG can teach you to Master Projects for Unlimited Growth. JOIN NOW


Get Weekly PM Insights

Join 50,000+ PMs receiving updates on the latest PM methodologies, PDU opportunities, tool reviews, career tips, and member exclusives.

Protected by reCAPTCHA: Privacy & Terms

PMI ATP
PMI Authorized Training Partner
REP #4082

Learning Paths

PMP® TrainingCAPM® TrainingPgMP® TrainingPMI-ACP® TrainingMS ProjectMS PlannerMS TeamsJira

PM Resources

PDU TrackerLive WebinarsSalary CalculatorTool ComparisonsJob BoardKnowledge BasePM GlossaryOur Faculty

Community

Discussion ForumStudy GroupsEvents Calendar

Follow Us

LinkedInYouTubeTwitterFacebook
MPUGMaster Project User Group

© 2026 MPUG. All rights reserved.

TermsPrivacySitemapAdvertise
Articles

Why Your Project Software Should Already Know What You Need Next

See how embedding process guidance directly into project software, instead of a separate manual, helps both people and AI know what to do next.

4 min read
•3 months ago•
E
Eric ChristophAuthor
Project Management
Microsoft Project
Best Practices
Productivity
E
Eric Christoph

Content Writer

Earlier in his career Eric served as Corporate EVM Subject Matter Expert for L-3 Communications. In that role he implemented multiple EIA-748 Earned Value Management Systems (EVMS) and helped build baseline plans for over 100 projects and proposal efforts with a combined value over $400B. Eric also represented L-3 on the Board of the NDIA Integrated Program Management Division (IPMD) which oversees the EIA-748 standard. Over the last fifteen years Eric has contributed to several key guidance documents related to EVM including the PMI Practice Standard for EVM, MIL-STD-881, and GAO-16-89G. Today, Eric is a Senior Partner at Transformative Management Solutions where we help project teams and organizations implement EVM and Agile project control solutions using Microsoft Power Platform technologies.

View all articles by Eric Christoph
Related Content

Continue Reading

Discover more insights and articles that complement your current reading

An Introduction to the PMI Practice Standard for Scheduling Conformance Index
Articles
1 min read

An Introduction to the PMI Practice Standard for Scheduling Conformance Index

Learn how the Conformance Index in PMI’s Practice Standard for Scheduling scores a CPM schedule model, and how to assess its components in any scheduling tool.

A
Anonymous
4 days ago
Read
A PM’s Halloween Survival Guide: The Sequel You Didn’t Want but Definitely Need
Articles
1 min read

A PM’s Halloween Survival Guide: The Sequel You Didn’t Want but Definitely Need

Part II of the PM Halloween survival guide takes on shape-shifting requirements and dependencies that won’t stay resolved, with practical defenses for each.

A
Anonymous
22 days ago
Read
Context Engineering for Project Managers: Give AI the Project, Not Just the Question
Articles
1 min read

Context Engineering for Project Managers: Give AI the Project, Not Just the Question

Learn how to choose, date, and source the project information you give AI, so its risk analyses, status reports, and change request reviews reflect your actual project.

A
Anonymous
about 1 month ago
Read
Explore All Articles