Ludovic Hauduc is a seasoned engineering and business leader with extensive experience in building and scaling infrastructure services and platforms. He recently served as Vice President of Engineering for the AI Infrastructure team at Meta, focusing on designing, building, optimizing, and scaling AI infrastructure services and systems to enable Meta’s AI needs. Previously, Ludovic held several leadership positions at Microsoft, including Corporate Vice President for the Core Platform Engineering organization, where he led the team responsible for building, modernizing, and running the core services and platforms driving Microsoft’s Digital Transformation. He has also served as General Manager and Director of Engineering for multiple Microsoft products, including Microsoft Project, Microsoft Office Developer Platform, and Microsoft Excel. Ludovic graduated from ESIGELEC, an engineering school based in France, with a degree in Electrical Engineering. He currently resides in Kirkland, WA with his wife and has two children.