What can I do when Outlook rules not working?

Home Forums Discussion Forum What can I do when Outlook rules not working?

Viewing 0 reply threads
  • Author
    Posts
    • #514778
      Anonymous
      Inactive

      When you find Outlook rules Stopped working, you must troubleshoot to minimize the size of the rules.
      For it, you can edit an Outlook rule. Follow these steps for editing a rule.

      Tap ‘File’ followed by ‘Manage Rules and Alerts.’

      Tap ‘OK’ if you notice a message saying ‘You have a broken rule.’

      Check the box beside it.

      Tap the links below the rule description and edit as needed.

      Tap ‘OK.’

Viewing 0 reply threads
  • You must be logged in to reply to this topic.