Home › Forums › Discussion Forum › Linking MS Project to CADWorx or Navisworks model
Tagged: CADWorx, Model, MS Project, Navisworks
An interesting question posed by an engineering manager where he is was told that “Apparently MS project can link to CADWorx or Navisworks model such that during a construction schedule, various model section highlight or flags come up as the schedule dates are reached.” Has anyone worked with this? My thought was that someone had done a hyperlink to the model file to check on status. Any other opinions?