How to freeze the first column ?

Home Forums Discussion Forum How to freeze the first column ?

  • This topic is empty.
Viewing 1 reply thread
  • Author
    Posts
    • #4996
      I use MS Project 2010. I have a View with many columns in a custom table and I would like the first column to stay on my screen when I update th other columns on the right.
      I tried the option “Lock first column” in the View tab but it does’nt seem to work. I’m not even sure what this option is doing …
      I’m sure there is something existing for this …
      Thanks,
      Janie
    • #6445
      Hi Janie —
      There is no ‘freeze columns’ feature in MS Project that behaves like the familiar feature in Excel. The ‘Lock first column’ option to which you refer, located in the ‘Table Definition’ dialog box, is typically used to lock the task ID column so that you can always see the IDs, regardless of how far you horizontally scroll a task or resource table. Notice that if you deselect the ‘Lock first column’ option, the ID column will no longer be ‘stuck’ on the left side of the view and will look and behave like any other column in the table.
      You may try opening the ‘Table Definition’ dialog box and adding your desired column as the first column in the table to lock that column from scrolling. However, the ID column will no longer be locked.
      Does this help?
      Good luck!
      Tony Zink, MCTS, MCITP, MCT
      Director of Client Services
      EPM Architects, Inc.
      Web: https://www.epmarchitects.com
      Blog: https://www.epmarchitects.com/blog
      Twitter: https://www.twitter.com/epmarchitects
      Visit Our Blog to Download Free Microsoft Project 2010 Quick Reference Cards!
Viewing 1 reply thread
  • You must be logged in to reply to this topic.